Demo- Remove exiting sliding doors from bedroom Remove window from hallway Foundation and blocks : Dig for new foundation and footers per plan Form for new foundation and concrete slab Install new rebars for foundation and concrete slab Pour concrete for new foundation and slab Install 2 new exterior walls from blocks Install blocks to close opening of sliding door and create opening for bathroom door Install new roof hangers on top of the blocks Pour concrete in the walls per plans Pass all the inspection Framing : Frame new roof trusses for flat roof Install new roof plywood Frame for new bathroom walls Frame for new closet walls Frame for new sliding door and 3 small windows windows Roof : Install TPO roof for new area Doors and windows : Install new 3 windows and sliding doors per plans water proof all windows and doors Install hardware for new doors and windows Install new trims for windows and doors Caulk and paint all trims and doors Plumbing : Run new plumbing for shower , toilet and single sink vanity including all new drain lines and water lines per code Tie new pipes into the existing system Electrical : Run new outlets for bedroom as needed per code Run GFCI outlets for bathroom as needed per code Run new electrical wire for bathroom exhaust fan Run new electrical wire for bedroom light and bathroom light Run new wires for 4 can lights in bedroom area Install all outlets switches and covers Drywall and paint : Insulate exterior walls per plan Install drywall for all new walls and ceiling per plan Patch drywall in hallway and existing bedroom as needed tape and mud all new drywall Texture all new walls with customer choose of finish Primer coat and paint coat for all new walls, ceiling, doors, trims and baseboards Stucco and Paint- Stucco all new walls with sand finish Primer and paint all new walls with customer choice of color Flooring : Prepare existing surface to be ready for new tile/wood/vinyl floor Install new floor per owner choice of pattern and design Trims- Install all new baseboard (5.5") and door trims (3.5") Caulk and paint new baseboards No new A/C installation at this time Bathroom- Frame in for recessed shampoo box Install rough in valves. Install drain for shower enclosure 2" Waterproof the entire shower walls. Waterproof shower pan . Install new shower head, shower control and valve control . Install trim for the shower valve. Install a new toilet. Install new sink vanity including p trap and water supply hoses. Install a new faucet. Install exhaust fan Install cement board on shower walls Waterproof walls with red Guard. Install tile on shower walls Install tile on shower pan. Install tile recessed shampoo box Install metal edging Schluter / bullnose tile. Apply grout and sealer Misc- Install mirror/medicine cabinet Install bathroom accessories Install custom made frameless shower glass door
$109,000.00