• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0510930
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Pending
Description

new sfr 3 bed 2 bath 2 car garage attached, front and rear porch

Job Value

$270,000.00

Owner
Guillermo Gaviria-Huichi
Address
8616 N 12TH ST, TAMPA, FL 33604
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Guillermo Gaviria-Huichi
Parcel
1462280005
Value
$40,400.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140006C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
000700
Population:
23

Preparing the map…

8616 N 12TH ST, TAMPA, FL 33604

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 7 Applied, 1 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-08-15
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-08-15
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-08-15
Termite Cert
Termite Certification Required
Informational • 2024-08-20
Termite Cert
Termite Certification Required
Informational • 2024-12-20

Related Records33

BLD-24-0510930
Pending
BLD-22-0493864-REV14
Complete
BLD-22-0493864-FR1
Pending
BLD-22-0493864-REV21
Complete
BLD-22-0493864-REV7
Complete
BLD-22-0493864-REV24
Complete
BLD-22-0493864-REV22
Complete
BLD-22-0493864-REV20
Complete
UTL-24-0000548
Pending
BLD-22-0493864-REV6
Complete
BLD-22-0493864-REV9
Complete
BLDLP-24-008115
Complete
BLD-22-0493864-REV16
Complete
BLD-22-0493864-REV23
Complete
BLD-22-0493864-REV17
Complete
BLD-22-0493864-REV15
Complete
CBO-25-0000041
Complete
BLD-22-0493864-REV2
Complete
BLDLP-23-006347
Complete
BLDLP-24-002479
Complete
BLD-22-0493864-REV5
Complete
BLD-22-0493864-REV19
Complete
BLD-22-0493864-REV13
Complete
BLD-24-0506680
About to Expire
BLD-24-0508201
Pending
BLD-22-0493864-REV8
Complete
UTL-24-0001871
Awaiting Client Reply
BLD-22-0493864-REV18
Complete
BLD-22-0493864-REV3
Complete
BLDCO-24-000684
Complete
BLDLP-24-002528
Complete
BLDCO-25-000297
Complete
BLD-22-0493864-REV4
Complete
BLD-24-0510988
Pending

Frequently Asked Questions

Related Links

Related Permits

  • BLD-22-0493864-REV14 (related)
  • BLD-22-0493864-FR1 (related)
  • BLD-22-0493864-REV21 (related)
  • BLD-22-0493864-REV7 (related)
  • BLD-22-0493864-REV24 (related)
  • BLD-22-0493864-REV22 (related)
  • BLD-22-0493864-REV20 (related)
  • UTL-24-0000548 (related)
  • BLD-22-0493864-REV6 (related)
  • BLD-22-0493864-REV9 (related)
  • BLDLP-24-008115 (related)
  • BLD-22-0493864-REV16 (related)
  • BLD-22-0493864-REV23 (related)
  • BLD-22-0493864-REV17 (related)
  • BLD-22-0493864-REV15 (related)
  • CBO-25-0000041 (related)
  • BLD-22-0493864-REV2 (related)
  • BLDLP-23-006347 (related)
  • BLDLP-24-002479 (related)
  • BLD-22-0493864-REV5 (related)
  • BLD-22-0493864-REV19 (related)
  • BLD-22-0493864-REV13 (related)
  • BLD-24-0506680 (related)
  • BLD-24-0508201 (related)
  • BLD-22-0493864-REV8 (related)
  • UTL-24-0001871 (related)
  • BLD-22-0493864-REV18 (related)
  • BLD-22-0493864-REV3 (related)
  • BLDCO-24-000684 (related)
  • BLDLP-24-002528 (related)
  • BLDCO-25-000297 (related)
  • BLD-22-0493864-REV4 (related)
  • BLD-24-0510988 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 7 Applied, 1 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-08-15
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-08-15
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-08-15
Termite Cert
Termite Certification Required
Informational • 2024-08-20
Termite Cert
Termite Certification Required
Informational • 2024-12-20

Related Records33

BLD-24-0510930
Pending
BLD-22-0493864-REV14
Complete
BLD-22-0493864-FR1
Pending
BLD-22-0493864-REV21
Complete
BLD-22-0493864-REV7
Complete
BLD-22-0493864-REV24
Complete
BLD-22-0493864-REV22
Complete
BLD-22-0493864-REV20
Complete
UTL-24-0000548
Pending
BLD-22-0493864-REV6
Complete
BLD-22-0493864-REV9
Complete
BLDLP-24-008115
Complete
BLD-22-0493864-REV16
Complete
BLD-22-0493864-REV23
Complete
BLD-22-0493864-REV17
Complete
BLD-22-0493864-REV15
Complete
CBO-25-0000041
Complete
BLD-22-0493864-REV2
Complete
BLDLP-23-006347
Complete
BLDLP-24-002479
Complete
BLD-22-0493864-REV5
Complete
BLD-22-0493864-REV19
Complete
BLD-22-0493864-REV13
Complete
BLD-24-0506680
About to Expire
BLD-24-0508201
Pending
BLD-22-0493864-REV8
Complete
UTL-24-0001871
Awaiting Client Reply
BLD-22-0493864-REV18
Complete
BLD-22-0493864-REV3
Complete
BLDCO-24-000684
Complete
BLDLP-24-002528
Complete
BLDCO-25-000297
Complete
BLD-22-0493864-REV4
Complete
BLD-24-0510988
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →