• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0513246
JurisdictionTampa City
Categorybuilding
Last CheckedFeb 19, 2026
Status
Complete
Job Value

$1,400,000.00

Owner
Bromley Tampa Investors Llc
Address
3600 MIDTOWN DR, TAMPA, FL 33607
Zoning
REGIONAL MIXED USE-100 (3.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Peoples Gas System Inc
Parcel
1110270628
Value
$31,988.00
00
Stories:
0
Units:
0
Buildings:
0
Acreage:
0.01
Land Use Code:
1099
Zoning Acres:
147440.3587
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004800
Population:
0

Preparing the map…

3600 MIDTOWN DR, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $5,596.54 · Paid $5,596.54 · Outstanding $0.00
Paid fee$654.60PaidFeb 24, 2025—
Paid fee$16.37PaidFeb 24, 2025—
Paid fee$161.26PaidFeb 24, 2025—
Paid fee$4,317.00PaidFeb 24, 2025—
Paid fee$386.40PaidDec 18, 2024—
Paid fee$10.91PaidDec 18, 2024—
Paid fee$50.00PaidDec 10, 2024—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

SECURE PLANS
Address is designated as "secured" based on F.S. 119.071(3)(e). “Office development” means any office building or park operated under common ownership, development plan, or management that encompasses 300,000 or more square feet of gross floor area
Informational • 2024-03-22
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-12-10
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2024-12-10
Post-construction video inspection
Per attached Second Amendment to Development Agreement, a video inspection of existing pipe in the post-construction condition from manhole to manhole in the vicinity of the concrete crane foundation and shall be completed. This shall be sent to Mobility Department, Stormwater Engineering Division. A condition will be added to the address. Once Stormwater Engineering Division records and approves the post-construction video inspection, the condition will be removed
Informational • 2025-02-14
Owner Letter Total Building Occupants
For each commercial alteration permit application, the building owner shall provide a notarized letter stating the total cumulative occupant load of the building referencing each respective BLD number for each suite/tenant space. This letter will be a requirement before certificate of occupancy of each permit. In the event the occupant load passes any required threshold, then the building owner will be responsible for the whole building to comply with applicable building code
Informational • 2025-03-14
Building - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-08-29

Related Records52

BLD-23-0496621
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-23-0496621 (parent)
  • BLDCO-23-000489 (child)
  • BLD-23-0496621-REV5 (child)
  • BLDCO-23-000354 (child)
  • BLDLP-25-001541 (child)
  • BLDLP-25-001045 (child)
  • BLDLP-24-005877 (child)
  • BLDCO-23-002182 (child)
  • BLD-25-0513246-REV1 (child)
  • CBO-23-0000049 (child)
  • IRW-22-0000018 (child)
  • BLDLP-25-007963 (child)
  • BLD-25-0517099 (child)
  • BLDCO-25-000188 (child)
  • CBO-23-0000142 (child)
  • BLDLP-25-007999 (child)
  • BLD-25-0513802 (child)
  • BLD-23-0496621-REV4 (child)
  • BLD-23-0496621-REV2 (child)
  • BLDLP-25-009261 (child)
  • BLDCO-23-000025 (child)
  • BLD-25-0513950 (child)
  • UTL-25-0000310 (child)
  • BLDCO-23-000389 (child)
  • PPR-22-0000070 (child)
  • BLD-23-0496621-REV8 (child)
  • BLDLP-23-004623 (child)
  • BLDLP-24-003242 (child)
  • BLD-23-0498100 (child)
  • BLDLP-24-009946 (child)
  • BLDLP-25-008288 (child)
  • BLD-23-0496621-REV6 (child)
  • BLDCO-23-002172 (child)
  • BLDLP-25-008060 (child)
  • CBO-23-0000136 (child)
  • CBO-23-0000063 (child)
  • BLD-24-0509291 (child)
  • BLDLP-25-009178 (child)
  • BLD-24-0506264 (child)
  • DET-22-0000039 (child)
  • BLD-23-0496621-REV3 (child)
  • BLDCO-25-000844 (child)
  • CBO-22-0000110 (child)
  • BLD-24-0510017 (child)
  • BLD-23-0496621-REV7 (child)
  • BLD-23-0501128 (child)
  • BLDLP-25-008768 (child)
  • UTL-22-0001818 (child)
  • BLD-24-0509916 (child)
  • CBO-23-0000145 (child)
  • BLD-23-0496621-REV1 (child)
  • PLN-18-0000016 (child)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Total $5,596.54 · Paid $5,596.54 · Outstanding $0.00
Paid fee$654.60PaidFeb 24, 2025—
Paid fee$16.37PaidFeb 24, 2025—
Paid fee$161.26PaidFeb 24, 2025—
Paid fee$4,317.00PaidFeb 24, 2025—
Paid fee$386.40PaidDec 18, 2024—
Paid fee$10.91PaidDec 18, 2024—
Paid fee$50.00PaidDec 10, 2024—

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

SECURE PLANS
Address is designated as "secured" based on F.S. 119.071(3)(e). “Office development” means any office building or park operated under common ownership, development plan, or management that encompasses 300,000 or more square feet of gross floor area
Informational • 2024-03-22
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-12-10
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2024-12-10
Post-construction video inspection
Per attached Second Amendment to Development Agreement, a video inspection of existing pipe in the post-construction condition from manhole to manhole in the vicinity of the concrete crane foundation and shall be completed. This shall be sent to Mobility Department, Stormwater Engineering Division. A condition will be added to the address. Once Stormwater Engineering Division records and approves the post-construction video inspection, the condition will be removed
Informational • 2025-02-14
Owner Letter Total Building Occupants
For each commercial alteration permit application, the building owner shall provide a notarized letter stating the total cumulative occupant load of the building referencing each respective BLD number for each suite/tenant space. This letter will be a requirement before certificate of occupancy of each permit. In the event the occupant load passes any required threshold, then the building owner will be responsible for the whole building to comply with applicable building code
Informational • 2025-03-14
Building - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-08-29

Related Records52

BLD-23-0496621
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →