SECURE PLANS
Address is designated as "secured" based on F.S. 119.071(3)(e). “Office development” means any office building or park operated under common ownership, development plan, or management that encompasses 300,000 or more square feet of gross floor area
Informational • 2024-03-22
Post-construction video inspection
Per attached Second Amendment to Development Agreement, a video inspection of existing pipe in the post-construction condition from manhole to manhole in the vicinity of the concrete crane foundation and shall be completed. This shall be sent to Mobility Department, Stormwater Engineering Division. A condition will be added to the address. Once Stormwater Engineering Division records and approves the post-construction video inspection, the condition will be removed
Informational • 2025-02-14
Owner Letter Total Building Occupants
For each commercial alteration permit application, the building owner shall provide a notarized letter stating the total cumulative occupant load of the building referencing each respective BLD number for each suite/tenant space. This letter will be a requirement before certificate of occupancy of each permit. In the event the occupant load passes any required threshold, then the building owner will be responsible for the whole building to comply with applicable building code
Informational • 2025-03-14
Building - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-07-07
Default - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2025-07-07
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2025-10-21